Commercial & Institutional

We don’t react when problems arise. We plan ahead, anticipate challenges and create plans that keep your project running smoothly and efficiently. In fact, many customers use our expertise before projects even begin. Our team can help develop designs and budgets up front that ensure success at the project’s end.

We are leaders in the commercial industry for:

  • Heavy civil site work
  • Underground utilities
  • Roadway installation
  • SWPPP/erosion control plans
  • Building pad construction
  • Demolition and cleanup
  • Mitigation and remediation
  • Concrete paving
  • Storm/sanitary sewer

Having the right resources can make all the difference, and MBC has the resources that deliver success. Using equipment with the latest technology means more than meeting deadlines—it means saving our customers time and money.

.

Contact Us About Your Next Project!
Click Here To See Our Completed Projects

arrows

Commercial Projects

Baja Fresh

Baja Fresh is a 74-acre design/build project consisting of a new milk processing and bottling plant for Walmart.

The 74 acres of site-wok included:

  • Sediment & erosion control plan with 280,000 cy of earthwork
  • 230,000 sf of chemical stabilized building pad
  • 8,100 lf of storm sewer
  • 4,700 lf of fire/waterline
  • 3,200 lf of sanitary sewer
  • 38,000 tn of aggregate base

Detroit Lions Practice Field

MBC supported Phase I reconstruction of the Lions practice field by providing SESC support, stripping topsoil and excavating the new fields to subgrade.  MBC crews installed silt fencing and a construction entrance to control site runoff and tracking of materials off the site.  After removing sod from the existing practice fields MBC stripped topsoil and excavated to subgrade for the new fields and access walkways.  An extensive irrigation and underdrain system was installed along with 18” of planting materials and specialized athletic field turf.

  • Strip Topsoil: 5,021 Cyd
  • Excavate/Grade Subgrade: 9,650 Cyd
  • Truck and Dispose of Spoils: 13,670 Cyd
  • Misc. Topsoil Surfacing: 2,000 Syd

The project was on a fast-track, MBC completed most of our work over a two week stretch in late February and early March 2017.  Future phases will include additional parking and site improvements aimed at heightening the fan experience at the practice facility.

Home Depot Distribution Facility: Northwest Ohio

  • Complete Civil Sitework
  • 150 Acre Site
  • Installed SWPPP System
  • Completed a 1.6M sf Building Pad Preparation in a 30-Day Period Including
  • 608,000 cy of Earthwork
  • Installed 145,000 tons of Aggregate
  • Excavated / Crushed 20,000 cy of Bedrock and Used Mat’l On-Site
  • 28,000 lf of Storm, Sanitary, Water
  • Installation of Roadways and Offsite Public Road Upgrades

Fallen Timbers Mall

  • $17M in Civil Sitework
  • 102 Acre Site
  • SWPPP Systems
  • Site Earthwork
  • Storm, Sanitary, Water
  • Building Pad Development
  • Installation of Roadways and Parking Lots
  • Award Recipient for Asphalt Paving

Ohio Turnpike Service Plazas

  • Williams County SP1 New Construction – $13,600,000
  • Mahoning County SP8 New Construction – $14,200,000
  • Lucas County SP2 Demolition and Enviro Cleanup – $3,100,000
  • Roller Compacted Concrete
  • Fuel System Installation
  • Petroleum Contaminated Soil Remediation
  • Asphalt Paving
  • Erosion Control
  • Mass Earthwork
  • Aggregate Base
  • Rock Excavation
  • Storm Drainage
  • Sanitary Sewer
  • Water / Fire Line
  • Concrete Paving

Fedex Freight Distribution Center

  • 80 Acres of Civil Site Development
  • Mass Earthwork & Grading
  • Erosion Control
  • Sanitary Sewer
  • Sanitary Pump Station
  • Storm Sewer
  • Fireline / Waterline
  • Asphalt Paving & Striping

Wauseon Middle School & Athletic Complex

  • Mass Earthwork
  • Erosion Control
  • Asphalt Paving
  • Polyurethane Track Surface
  • Concrete Paving
  • Storm Sewer
  • Sanitary Sewer
  • Fireline
  • Field Grading
  • Seeding & Landscaping

Sports Force Parks at Cedar Point Sports Center

  • Moved 50,000 cubic yards of earth
  • Imported nearly 40,000 tons of aggregate
  • 2,5000 lf of waterline
  • 2,500 lf of sanitary line
  • 11,000 lf of storm pipe

Bowling Green State University: Parking Facility Improvements

  • 30 Acre Civil Site Project
  • Asphalt Paving
  • Underground Utilities
  • Rock Excavation
  • Erosion Control
  • Mass Earthwork
  • Paving Award recipient from Flexible Pavement Assoc.

Clemens Food Group

Toledo Hospital: Mass Excavation

Summit Motorsports Park – Track Reconstruction

MBC had a design build agreement for track reconstruction on this drag strip racetrack in Norwalk, Ohio. The nearly $1.4 project culminated in one of the only all-concrete racing surfaces in the country. The project included removal of the existing track, regrading and installation of subgrade, and the installation of the concrete pavement.  The project also included asphalt mill and fill along the staging lanes and cool down lanes.

  • 96,000 SF of Full-Depth Pavement Removal
  • 78,300 SF of HMA Mill & Fill
  • 96,000 SF of 8” Fiber Reinforced Concrete
  • 7,040 LF of 6” Base Pipe Underdrain

Contact Us About Your Next Project!

Name (required)

Company (required)

Phone

Email (required)

Message