Heavy Highway Construction Projects
ODOT
060433 Defiance & Henry Counties
USR 24
$50 Million
May 2006
June 2009
Construct 12 mile section of 4 lane divided highway between Napoleon
and Defiance with a new interchange at Dommersville Road. Structures on
the project includes 2 each 2 span overhead bridges at Carpenter and
Dommersville Roads, 2 each 1 span mainline bridges over Garrett Creek,
3 each box culverts and redecking SR 281 over the Maumee River.
ODOT
070324 Wood County IR 280
& Curtice Road
$3.3 Million
Oct 2007
Oct 2008
Reconstruct the four ramps at the IR 280 and Curtice Road interchange.
Provide new traffic signals at 3 intersections. Included reconstructing
ramp O using an MSE wall.
ODOT
070411 Henry Co USR 24
$1.5 Million
July 2008
Sept 2008
Reconstruct USR 24 under the CSX railroad viaduct. The project improved
lane and shoulder width, provided protection to bridge piers and improved
drainage. All work was completed under a 45 calendar day closure.
ODOT
080152 Henry County USR 24
$50 Million
June 2008
June 2011
Construct 5 mile section of 4 lane divided highway between Napoleon and
Texas with a new interchange at SR 109. Structures on the project includes
2 each 1 span overhead bridges, 2 each 5 span mainline bridges over
CSX railroad, 2 each 1 span mainline bridges over Dry Creek and 2 each
3 span mainline bridges over Bad Creek.
ODOT
080419 Henry Co Wetland Mitigation
$2.5 Million
June 2008
Oct 2009
Construct 27 acres of wetlands and adjacent upper buffers. The project
includes earthwork, drainage, seeding and planting of over 6,000 trees
and tree seedlings.
ODOT
088032 Wood County SR 795
$3.7 Million
Oct 2008
Oct 2009
Replace existing deficient bridge with a 2 span continuous steel girder bridge.
Reconstruct the roadway and ramp intersection including a new traffic
signal.
City of Toledo
Halfway Creek
$2.0 Million
June 2008
Nov 2008
Replace existing slab deck bridges on Halfway Creek at Jackman and Stateline
Roads with Con Span precast structures and rebuild the adjacent roadway.
The project also included sanitary and waterline crossings under Halfway
Creek.
Logan County
CR 63 Bridge over CSX Railroad
$2.5 Million
May 2008
June 2009
Remove a structurally deficient bridge with a single span structural steel
deck girder superstructure with reinforced concrete deck on reinforced
concrete semi-integral abutments supported on steel piles.
Defiance County
Stever Road Bridge
$250,000
May 2008
July 2008
Replace the concrete deck and side bridge railing on Stever Road bridge.