Safety Cents
  Miller Bros. Construction, Inc. -

Heavy Highway Projects

 
ODOT 060433 Defiance & Henry Counties
USR 24
$50 Million May 2006 June 2009 Construct 12 mile section of 4 lane divided highway between Napoleon
        and Defiance with a new interchange at Dommersville Road. Structures on
        the project includes 2 each 2 span overhead bridges at Carpenter and 
        Dommersville Roads, 2 each 1 span mainline bridges over Garrett Creek,
        3 each box culverts and redecking SR 281 over the Maumee River.
           
ODOT 070324 Wood County IR 280
& Curtice Road
$3.3 Million Oct 2007 Oct 2008 Reconstruct the four ramps at the IR 280 and Curtice Road interchange. 
        Provide new traffic signals at 3 intersections. Included reconstructing 
        ramp O using an MSE wall. 
           
ODOT  070411 Henry Co USR 24 $1.5 Million July 2008 Sept 2008 Reconstruct USR 24 under the CSX railroad viaduct. The project improved
        lane and shoulder width, provided protection to bridge piers and improved 
        drainage. All work was completed under a 45 calendar day closure. 
           
ODOT 080152 Henry County USR 24 $50 Million June 2008 June 2011 Construct 5 mile section of 4 lane divided highway between Napoleon and
        Texas with a new interchange at SR 109. Structures on the project includes 
        2 each 1 span overhead bridges, 2 each 5 span mainline bridges over 
        CSX railroad, 2 each 1 span mainline bridges over Dry Creek and 2 each 
        3 span mainline bridges over Bad Creek. 
           
ODOT 080419 Henry Co Wetland Mitigation $2.5 Million June 2008 Oct 2009 Construct 27 acres of wetlands and adjacent upper buffers. The project
        includes earthwork, drainage, seeding and planting of over 6,000 trees
        and tree seedlings. 
           
ODOT  088032 Wood County SR 795 $3.7 Million Oct 2008 Oct 2009 Replace existing deficient bridge with a 2 span continuous steel girder bridge.  
        Reconstruct the roadway and ramp intersection including a new traffic
        signal.
           
City of Toledo Halfway Creek  $2.0 Million June 2008 Nov 2008 Replace existing slab deck bridges on Halfway Creek at Jackman and Stateline 
        Roads with Con Span precast structures and rebuild the adjacent roadway. 
        The project also included sanitary and waterline crossings under Halfway
        Creek. 
           
Logan County CR 63 Bridge over CSX Railroad $2.5 Million May 2008 June 2009 Remove a structurally deficient bridge with a single span structural steel
        deck girder superstructure with reinforced concrete deck on reinforced
        concrete semi-integral abutments supported on steel piles. 
           
Defiance County Stever Road Bridge $250,000 May 2008 July 2008 Replace the concrete deck and side bridge railing on Stever Road  bridge. 


     

 
   