Rail, Intermodal & Airport

When you need creative solutions, attention to detail and a commitment to completing projects on schedule, count on Miller Bros. Const., Inc. Our successful track record in the rail and intermodal industries positions us to deliver above and beyond your expectations. We have the resources and experience to complete fast-track intermodal facilities, mail line projects and industrial sidings.

If your project presents a challenge, we can present the right solution. Our extensive rail & intermodal capabilities include:

  • Excavation
  • Embankments
  • Remediation
  • Milling
  • Topsoil placement
  • Mass earthwork
  • Storm drainage
  • Bridge construction
  • Asphalt/concrete pavement
  • Marine

From CSX to Norfolk-Southern Railroad, we have successfully completed projects for some of the top names in the industry. Browse our portfolio below and contact us to put that experience to work on your next project.

Contact Us About Your Next Project!
Click Here To See Our Completed Projects

arrows

Rail, Intermodal & Airport Projects

Toledo Express Airport: Apron Reconstruction – Phase 1

  • Contract Value – $6,170,100.00
  • Tarmac & Taxi-way Improvements
  • 84,300 sy Asphalt & Concrete Demolition
  • 31,000 cy of Soil Excavation
  • 41,645 Tons of Asphalt Pavement
  • 36,895 sy of Concrete Pavement

Port Authority Ironville Terminal: Phase 1

  • 16,800 cy of Excavation
  • 22,000 cy of Embankment
  • 6,125 cy of Sub-ballast Stone
  • 14,800 lf of Railroad Track Installation
  • Relocated Petroleum Product Pipeline
  • Stormwater Management and Collection System

Norfolk & Southern Railroad: Grade Separation – Hallett Street

Roadway:

  • 6,930 ft of Storm Sewer (4” – 42”)
  • 3,150 ft of Waterline (12”)
  • 46,000 Vlf of Wick Drains
  • 20,600 cy of Sand Blanket
  • 119,700 cy of Embankment
  • 24,170 sy of New Pavement

Bridge:

  • 6,600 sf of MSE Walls
  • 4,200 ft of 12 in. & 14 in. Tube Piles
  • 365,685 LBS Structural Steel, Level 4
  • 950 cy of QC/QA Bridge Concrete

Interstate I-280 Improvements

  • Constructed Temporary Railroad Bridge across Interstate I-280
  • Installed Temporary Siding
  • Reconstruct & Lengthen Mainline Rail Bridge 108 ft.
  • Maintained Live Traffic at all times
  • Installed Extensive Sheet Pile Embankment Retension System
  • Significant Coordination with Rail Operations